President’s Wrap and Discussions

President’s Wrap
Starting time is 3.00pm March 24. After a short discussion on our Pennant performances and plans other presentations will follow. Below is the survey to be distributed on the day re Capital Works. It is reproduced here so you can review it prior to March 24.
——————————————————————————————————————————————–
Priorities for Major Capital Works
Capital works are underway for replacement of bottom green, green lighting upgrade and top green ramp. Members are asked their opinion on priority for further capital works. Please indicate your preference by placing number 1 the box of your first choice, number 2 in your second choice etc.

Club Exterior
• Painting of roof
• Rendering of brickwork
• Replacing some windows
• General tidy up

Club Interior
Replacement of ceiling incorporating:
• New integrated lights
• Sound system
• Possibly air conditioning
• Emergency lighting
• Fire / smoke alarms

Club Shed/BBQ/Entertainment
Replacement of sheds and incorporating:
• Gas Barbeque – similar to Council BBQs
• Memorial Garden
• Permanent workshop
• Outdoor entertaining area

Club Kitchen
Refurbishment of Kitchen:
• Stainless steel benches
• Fridge
• Cupboards
• Stove
• Extraction system
• Floor coverings
• Dishwasher

Roof Over bottom Green
• Roof over bottom Green
• Enclose sides with see-through wind protection

Other – state any other major capital works which you would like to see which is NOT listed above. Please specify: